VR NONGKTIEH Final-2024

C:\Users\w10\Desktop\CLLMP\1.GROUND TRUTH SURVEY\Nongktieh GTS\IMG_20181127_112551.jpg

REPORT ON

NONGKTIEH VILLAGE UNDER RANIKOR C&RD BLOCK

DISTRICT: SOUTH WEST KHASI HILLS

COMMUNITY LED LANDSCAPE MANAGEMENT PROJECT

WB.jpgIMG-0179 (1) (1).PNG

COMMUNITY LED LANDSCAPE MANAGEMENT PROJECT (CLLMP)

The Government of Meghalaya with the financial help from the World Bank has been implementing the Meghalaya Community Led Landscape Management Project (MCLLMP). The project covers the entire state of Meghalaya and implementation of community led plans have been rolled out in phase manner throughout the state. The Meghalaya Basin Management Agency (MBMA) had facilitated the community-led planning by providing support, technical inputs and funding.

The project had strengthened community-led natural resources management in selected landscapes within the 12 districts of the state. This has been achieved through a variety of planning, capacity building, and on-the-ground interventions to promote the conservation, sustainable use of natural resources, social inclusion and community mobilisation; building traditional knowledge and learning, mapping of natural resources management; strengthening the community institutions and creating linkage with financial institutions and community organizations.

The project interventions include the preparation of community led natural resource management plans. The CLLMP has the following three components:

Strengthening Knowledge and Capacity of Communities for Natural Resources Management

Community-Led Landscape Planning and Implementation

Project Management and Governance

The project objective is “to manage and conserve the natural resources, especially forests, soil and water sources, in a manner that supports the financial and physical well-being of communities in the State”


SCOPE:

The CLLM-Programme focuses on increasing the capacities of communities and traditional institutions (TI) by adopting a landscape approach to manage their natural resources such as soil, springs and other water sources, forests and bio-diversity, etc.

The project has been planned and implemented in about 400 villages across the state.

CLLMP has a strong focus on institution-building at the village-level, by ensuring systematic capacity-building on technical and social skill-sets.

The project has also extended such trainings to communities beyond the targeted villages and support efforts made by them to access funding from various rural and natural resources initiatives and schemes.

The programme has also invested in improving the process and outcome delivery, by developing and adhering to effective systems and procedures, supported by the appropriate technology.

BENEFITS:

Benefits for community (Skills and Capacity relating to technical and managerial areas like NRM and Conflict resolution.

Benefits to traditional institutions (village councils, traditional leaders, community-based organizations, SHGs etc) through Knowledge sharing, promotion of innovative approach, access to technology, technical managerial and financial support.

It has been estimated that the project has impacted around 1 lakh partners (of which 50% are women) who depend on land, forest, agro forestry.

Through the project, 55000 Ha of targeted area has been ensured with availability of water, biological resources and soil productivity, which has in turn benefitted around 400 villages and the outcomes delivery can be summarized as follows.

IMPLEMENTATION AGENCY:

The Project has been executed by the MBMA in collaboration with other partners particularly, SIRD (for training and capacity building), Department of Soil and Water Conservation, Water Resource Department, Forest Department, specifically with respect to technical inputs, safeguards management and Community NRM plan preparation.

PROJECT PERIOD:

2018-2023 (5 years)

TABLES OF CONTENTS PAGE NO.

  1. INTRODUCTION. 5

  1. Brief History About the Village 5-6

  2. Social Profile of The Village 6-9

  1. Village Accessibility 6

  2. Literacy Rate 6

  3. Population 7

  4. Occupation 7

  5. Fuel Type 8

  6. Card Holding Household 8

  7. Drinking Water 8

  8. Cultivable Land Area 8

  9. Forest Cover 8

  10. Forest Species 9

  11. Water Bodies 9

  12. Area Affected 9

  1. CLLMP ACTIVITIES.

  1. GROUND TRUTHING 9

  2. Sensitization Program 10

  3. Signing of EOI, VGA and Green Charter 11

  4. Formation Of the VNRCM 11-14

    1. Village functionaries 12

    2. Village Community Facilitator 13

    3. Procurement Member 13

  5. Opening Of Bank Account 13-14

  6. Participatory Rural Appraisal Exercise 15-18

  7. Gis Activities 19-20

  8. The Proposed List of Intervention 20-21

  9. Project Implementation 21-31

  10. Fund Status 32-33

  11. Ground Testimonials_________________________

INTRODUCTION:

Nongktieh village falls under Ranikor C&RD Block of South West Khasi Hills District in the state of Meghalaya. The village has a distance of 18 kms from Block Headquarter and 28 kms from Mawkyrwat, the District Headquarter. It falls under Hima Maharam Syiemship with a total geographical area of 1229.6 ha and a total population of 1082 villagers. All the resident of Nongktieh village belonged to the Khasi Scheduled Tribe. The average rainfall of this village is 1200- 3000 mm and the type of soil is fine loamy and coarse loamy.

D:\Nongktieh_Boundary.jpg

BRIEF HISTORY OF NONGKTIEH VILLAGE:

Nongktieh village is under Hima Maharam, South West Khasi Hills District. It exists in the North Eastern side from the hills Iawpaw. This village is like a ground field resembling a table where there are many cliffs that are beautiful to look at.

The village is adjacent to two rugged soils which are of the two clan that is of the clan Lyngkhoi Nongnah and the clan Paliar. The village is called Nongktieh because the whole length of the village is full with mud especially in the rainy season. The first people who came and settle in this village was Larwan Thongni from Rangjadong village who married Step Lyngkhoi from Ngunraw village. The couple did not settle in Rangjadong village instead they came and settle in the mountain Mawtariem and since then they name that place as ‘Step Larwan’. But because they did not find an alter to sacrifice their Gods, they decided to came and settle at Nongktieh which is near to the altar to sacrifice. As the time goes by, to make the village more sufficient, Larwan Thongni went to pick up the clan ‘Kurkania and Nonglong from ‘Dommaning’ to settle together with them. Till now, these clans still settled there.

SOCIAL PROFILE OF THE VILLAGE:

The Dorbar serves as the traditional form of local governance in the village and looks after the administration, safety of villagers as well as overall governance. Apart from the village Dorbar, there is also the Nongktieh VEC and the recently formed VNRMC which looks after the implementation of CLLMP activities aided by the World Bank.

Nongktieh village has a total number of 158 households and having the population of 982 villagers. Agriculture and its allied activities are highly vogue in this village, where some few others are being engaged in labourers, government services, and in business.

Village Accessibility: In order to reach to Nongktieh village one must take a road toward Rangthong village then to Keniong, Mawtaiem and turn in the left side of the road there is Nongktieh village.

Literacy Rate: As per census 2011, literacy rate of Nongktieh village was 67.38% out of which 65.92 males and 68.69%females are literate.

Population: As per census 2011, this village has a total population of 564 peoples, out of which male population is 267 while female population is 297 which has increase to 982 as per 2019 survey. Out of this 485 are male and 497 are female. This village has 106 populations of children between the age of 0-4 where 57 boys and 49 are girls.

Age groups Male Female Total
0-4 57 49 106
5-14 122 148 270
15-30 255 230 485
30-60 30 40 70
Above 60 21 30 51

Occupation:

The people of the village rely on agriculture and forest products for their livelihood. The main occupation of the villagers is farming followed by labourers, Government service and business.

Cards Holding Household:

Name of Cards No of Households
AAY 16
PHH 108
Health cards 84

Fuel Types:

Most of the Household in Nongktieh village mainly use wood as fuel some are use LPG and electricity.

Type of Fuel Total No of HH Qty (Kgs/HH) Total
Wood 130 6000kg (1 year) 78,0000kg
LPG 25 60kg (1 year) 1500kg
Electricity 3 1000 bill 1 month

Drinking water:

The people of Nongktieh village have access to drinking water mainly from 3 springs that are within the village. Government water supply lines are also available in this village. But there has been a scarcity of water supply. As the source of water is downhill and settlement is uphill.

Cultivable Area:

The type of soil in Nongktieh village is fine loamy and course loamy soil. People practise shifting cultivation in private and clan lands. The main cash crops of Nongktieh village are, Arecanut, Betel vine, Wild Pepper, Bay leaf, and Broomstick. They also cultivate Orange, Lemon, Jackfruit and Litchi.

Forest Cover:

The total forest cover under Nongktieh village is 950.47 Ha. There are two protected forests one which is of the community and the other of the clan Lyngkhoi. There are also 4 numbers of clan forests namely, khlaw Lyngkhoi, Khlaw Paliar, Khlaw Khurnia, Khalw Syiemlieh. The quality of these forest ranges from open to dense. People use the forest products mainly for fuelwood.

Forest Species:

Some of the indigenous tree species and commercial valuable trees found in this village are Diengngan, Diengsohmon, Diengkhiat, Diengsnammaw, Diengsohlajat, Diengwaitlamkhar, Diengsohkhajur, there are some other valuable medicinal trees like Diengjaler (Bark- fracture), Diengbliat (roots- applied to wounds), Pitcher plant (fluid- healing to ears), (Roots- Khait - skin diseases) which are useful for the community. Some endangered species of flora and fauna found in Nongktieh village are: Diengsohpdung, Dieng bat mekhra, diengsohniamtra, Sla sohtngaw, phan saw niehtang, wild animals (Tngaw, khlathapsim, kyrbei (iguana), dngiem, Niangkhlaw (wild boar).

Water Bodies:

Total area of water bodies in Nongktieh village is 17.99 Ha. There are three springs within the village which people use mainly for drinking purpose. There are some streams which people use for domestic and drinking and three rivers which flow within the village geographical area which are used for conservation purpose.

Area Affected:

In Nongktieh village about 28.39 ha of land have been degraded over the years. Approximately 9.65 ha are due to soil erosion and excessive felling of trees. About 28.39 ha of land have been degraded over the years owing to human settlement, water bodies, grassland and culturable wastelands.


CLLMP ACTIVITIES:

  1. GROUND TRUTHING:

The CLLMP officials met with Mr.Stearnoi Langte headman of Nongktieh village, Kupborlin Lyngkhoi the village Secretary and other village representatives for field assessment. Mr.Langte provided the CLLMP Team with important information regarding the current scenario of the landscape and the natural resource management under his headman ship.

Case Findings:

  1. SENSITIZATION PROGRAMME:

The District Project Manager Mr.J.Wanniang along with the staff held a village Level Sensitization Programme on the Community Led Landscape Management Project (CLLMP) on the 17th January, 2019.The villagers actively participated in the program, voicing out their concerns and questions regarding the project making it a huge success.

Highlights of the meeting:

C:\Users\w10\Desktop\CLLMP\3.SENSITIZATION\8.Nongktieh Senstizatn 17th Jan 2019\IMG-20190117-WA0120.jpg

C:\Users\w10\Desktop\CLLMP\3.SENSITIZATION\8.Nongktieh Senstizatn 17th Jan 2019\IMG-20190117-WA0119.jpg

Fig: Sensitization Program at Nongktieh.

  1. SIGNING OF EOI, VGA AND GREEN CHARTER:

On 17th January, 2019 Nongktieh village signed the EOI (Expression of Interest), VGA (Village Grant Agreement) and the Green Charter after there was a uniform agreement by the people of the entire Community that the Community Led Landscape Management Project (CLLMP) be implemented at Nongktieh village.

C:\Users\w10\Desktop\CLLMP\3.SENSITIZATION\8.Nongktieh Senstizatn 17th Jan 2019\IMG-20190117-WA0101.jpg


  1. FORMATION OF THE VNRMC:

The formation of the Village Natural Resources Management Committee was done in a public meeting on the 17th January,2019 in the presence of the entire village and the CLLMP Staff. The people of the community chose the President, The Secretary, the Purchase Committee members and the other Executive members to formed the Nongktieh VNRMC. There are 9 Executive members, 3 Village community Facilitator and 3 Purchase Committee members.

List below are the members of the VNRMC:

Village Natural Resource Management Committee (9members committee constituted from Village Council, SHG group, Women’s group, youth, VEC)
Sl No Name Designation

Gender

(M/F)

Age in years Qualification Occupation Community Phone No.
1. Shembirlang Rngaid President Male NA NA Teacher Khasi 8837010618
2. Totally Langte Secretary Male 42 XII Cultivator Khasi 8787442519
3. Balasumarlin K Turnia F. Secretary Male NA NA NA Khasi NA
4. Bundor Ramsiej Member Male 45 IX Farmer Khasi 7005646177
5. Rakesh K. Turnia Member Male 38 VIII Farmer Khasi 9366355820
6. Minorris Ramsiej Member Female 35 XII Farmer Khasi 6009724258
7. Banisha K Bani Member Female 30 VIII Farmer Khasi 8787359718
8. Iohty Ramsiej Member Female 47 VI Farmer Khasi 9856370118
9. Piodalin Lyngkhoi Member Female NA III Farmer Khasi NA


VILLAGE FUNCTIONARIES

Traditional Village Institutional Functionaries (Village Dorbar)

Sl No Name in Full Gender M/F Age Education Designation Occupation Contact No.
1. Stearnol Langte M 40 BA Myntri Teacher 8837059235
2. Kupborlin Lyngkhoi M 42 XII Secretary Cultivator 8787352950
3. Smanding Turnia M 56 VIII Member Teacher 8787653014
4. Bundor Ramsiej M 45 IX Member Farmer 7005646177
5. Tanbor K Turnia M 41 BA Member Farmer 9366234624
6. Throning Nonglong M 59 VII Member Teacher 9856370118
Village Community Facilitators (VCF)
Sl no. Name Age Gender Qualification Contact Number Role
1 Joyfully Syiemlieh 27 Female BA 9774782287 Social and KM
2 Bikromshan Lyngkhoi 34 Male XII 7005154064 Evst and GIS
3 Nimrose Ramsiej 28 Male BSC 8731851109 Document ME

C:\Users\w10\Desktop\CLLMP\nongktieh image\IMG-20220711-WA0001.jpg

+

Fig: Village Community Facilitators.

Procurement Members
Sl no. Name Age Gender Qualification Contact Number
1. Nipallan Lyngkhoi 28 Male BA NA
2. Tressmerry Riamsiej 24 Female XII NA
3. Banshanti Syienlieh 28 Male XII NA


  1. OPENING OF BANK ACCOUNT:

The opening of the bank account was done after the signing of the EOI (Expression of Interest), the VGA (Village Grant Agreement) and the signing of the Green Charter. The Accountant of CLLMP South West Khasi Hills trained the Purchasing and Procurement Committee of Nongktieh village on matters relating to Accounts and Book Keeping and on the:

  1. Principles of Community Procurement

  2. Benefits of Community Procurement

  3. Important aspects undertaken by Community Procurement.

  4. Procurement Process/Steps

  5. Function of Purchase Committee

  6. Important Procurement records to be maintained

  7. Financial limits and methods

  8. Maintaining of Books of Accounts to the Book Keeper.

C:\Users\w10\Desktop\CLLMP\nongktieh image\IMG-20220711-WA0000.jpg

Fig: Bank Account Details.


  1. PARTICIPATORY RURAL APPRAISAL EXERCISE:

The PRA exercise aims to incorporate the knowledge and opinions of the community in the planning and management of development projects and programmes.

The PRA exercise took place on the 18th March, 2019 and the villagers took part in this exercise and also contributed their time and knowledge to this project.

The District Project Manager gave the introduction and spoke about the different activities that the participants had to take part in the programme.

The Program Associate, Environment Management, spoke about the different CNRM plans and the different types of intervention. A group of participants interacted and helped in the collection of data based on the environmental template. With the help of this group, different sites of interventions were identified, analyzed and evaluated in order to prioritized the areas that needed the natural resources management.

The Assistant Manager, Social Management, gathered the remaining group of participants to gather the baseline data bases on the social template.

The main objectives of PRA exercise are:

Findings based on the information gathered from the participants during the PRA/CNRMP exercise:

Priorities Intervention required based on the PRA Exercise:


Baseline Data Survey to fill the Environment and Social Template:

During the PRA Exercise the External Expert of Social & Environment Management held a group discussion with the different groups to gather basic village information regarding number of households, demographic information, major crops and enterprises taken in the village, trends of production and productivity of major crops in the village and demographic distribution of village population.

Information related to land use category such as forest, cultivable land, water bodies, etc and the problems and challenges related to NRM were discussed.

Focused Group Discussion on Problem Analysis:

  1. Do people have sufficient access to supply of fodder, fuel wood, leaf litter?

  1. Has access to timber improved or reduced over the years? How is access for household use and commercial use managed?

  1. Are the water bodies facing any threats?

  1. Do all people in the village have access to drinking water? What are the challenges?

  1. Are there degraded areas in the village (open/ degraded forests, mining affected, high soil erosion etc.)?

  1. What has caused this degradation? Are there practices causing threats to availability and access to natural resources?

    • Fertility of the soil has decline over the year.

    • The practices that cause threat to the availability of these resources are:

    • Fires that take place every year

    • Excessive practice of Jhum Cultivation

  2. What have been the changes in agricultural practices?

    • Previously their method of farming is Shifting Cultivation, but over the years with much awareness people have now direct to more conservation practises in order to recover the forest.

  3. Are there any challenges in farming?

    • The main challenges faced by the people is that over the years they have seen a decline in the soil productivity due to soil erosion.

  4. How would you consider the health situation in your village?

  1. How is the situation of cleanliness, sanitation, access to toilets and waste management?

    • Sufficient toilets are available in every household but most of the constructions are poor. The presence of VWSC in the village has also improve sanitation and cleanliness. But Waste Management is poor because people are not really aware of how to properly disposed off waste.

  2. Who are the most vulnerable in the village? What can be done to improve their lives?

  1. What are the livelihood aspirations of the youth? Are there any avenues available?

    • None, except daily wages labourers.

  2. Do any committees/ institutions/ rules exist to manage and monitor natural resources in the village?

    • The VNRMC under the CLLMP is the main committee that is now in place to manage the natural resources in the village.

  3. What are some of the major issues of conflict in the village?

    • Nothing related to NRM.

  4. Have any of the above issues been discussed in village meetings?

    • NA

P. How do people resolve disagreements and conflicts?


Village Boundary Mapping and Recourse Mapping:

The GIS personnel along with the Village Community Facilitators mapped the village boundary of Nongktieh village.

C:\Users\w10\Desktop\CLLMP\From RON'S Drive\CLLMP Maps\IMG_20210715_170537.jpgThe village resource map is prepared by the people of the community. In this resource map, the local people prepare it by drawing it on chart paper. Recourses such as agricultural lands, wells, wastelands, cattle population, playgrounds, ICDS, churches, community halls, etc were mapped.

C:\Users\w10\Desktop\CLLMP\From RON'S Drive\CLLMP Maps\IMG_20210715_172731.jpg

Fig: Village boundary Map.


7.GIS ACTIVITIES:

Sl. No. Parameters Village Information
1. GPS Coordinates:
i Latitude 25.2657
ii Longitude 91.33923
iii Elevation Reading (MSL) 3520m
2. Village Geographical Area (Ha) 1229.6 Ha
i Total Forest Area (including community, Clan, Pvt Forest) 950.47 Ha
ii Total Area of Water Bodies 17.94 Ha
iii Total Area under Agri-Horticulture 18.79 Ha
iv Total Degraded land area (Ha) 7.24 Ha
3. Average Annual Rainfall 1200-3000mm
4. Soil Type Fine loamy and course loamy soil.

D:\Nongktieh_Boundary.jpg


Figure: Boundary Map of Nongktieh village.

E:\swkh_west khasi hills\Ranikor\Nongktieh\map_output\lulc\Nongktieh_lulc.jpg

Fig: LULC Map of Nongktieh.

8.THE PROPOSED LIST OF INTERVENTIONS:

Sl No

Name Of Proposed Interventions Site

Land Ownership

Nos Of HH’s Expected to Benefit Priority (High/ Medium/ Low)

Total

1. Drip Irrigation Work: CC Dam Nongktieh Private

25

High
2. Conservation Pond Photdew Byrtha Community

20

High
3. Afforestation Photphlang, Photdewbyrtha and Photipliang

Community

158

High
4. Protection Wall Nongktieh Community

80

High
5. RCC Lid of a Conservation Pond Photdewbyrtha

Community

20

High
6. Water Harvesting Structure Nongktieh

Commnity

15

High
7. Soak pit drain and platform Phot Dewbyrtha

Community

35

High
8 Drip Irrigation Work: Ground Water Tank Nongktieh

Community

10

High
9 Drip Irrigation Work: Distribution Tank Nongktieh

Coomunity

15

High
10 Afforestation Development Work Nongktieh

Community

158

High
11 Plantation Work Nongktieh

Community

158

High
12 Protection Wall Nongktieh

Community

4

High
13 Roadside Tree Plantation Nongktieh

Community

60

High
14 Natural Footpath Nongktieh

Community

80

High

9.PROJECT IMPLEMENTATION:

1. Type Of Intervention Site Name GPS Co-ordinates Amount Sanctioned Work Status
RCC lid of a conservation pond & Soak pit, drain and platform Photdewbyrtha 25.270455 91.33833 Rs. 29,160 +37,270 Completed

C:\Users\w10\Desktop\CLLMP\nongktieh image\SAVE_20210909_120431.jpg

Fig: RCC lid of conservation pond, soak pit drain & platform.


2. Type Of Intervention Site Name GPS Co-ordinates Amount Sanctioned Work Status
Drip Irrigation works: CC Dam Umsaw 25.26696 91.339593 Rs. 3,00,000 Completed

C:\Users\w10\Desktop\CLLMP\nongktieh image\20220407_161743.jpgC:\Users\w10\Desktop\CLLMP\nongktieh image\20220317_135436.jpg

Fig: Drip Irrigation Work: CC Dam.

3. Type Of Intervention Site Name GPS Co-ordinates Amount Sanctioned Work Status
Drip Irrigation works: Ground water tank Ladjasang 25.264522 91.342938 Rs. 3,00,000 Completed

C:\Users\w10\Desktop\CLLMP\nongktieh image\20220421_150233.jpg

Fig: Drip Irrigation Works: Ground Water Tank.

4. Type Of Intervention Site Name GPS Co-ordinates Amount Sanctioned Work Status
Drip Irrigation works: Distribution Tank Nongktieh 25.26115 91.350968 Rs. 4,80,000 Completed

Fig: Drip Irrigation works: Distribution Tank.


C:\Users\w10\Desktop\CLLMP\nongktieh image\20220523_160632.jpg

5. Type Of Intervention Site Name GPS Co-ordinates Amount Sanctioned Work Status
Water Harvesting Structure Phottyllang 25.29947 91.337628 Rs. 2,50,000 Completed

C:\Users\w10\Desktop\CLLMP\nongktieh image\20220504_082044.jpg

Fig: Water Harvesting structure at Phottyllang.

6. Type Of Intervention Site Name GPS Co-ordinates Amount Sanctioned Work Status

Road side Tree

Plantation

Nongktieh 25.269402 91.338723 Rs. 49,900 Completed

Fig: Roadside Plantation.

7. Type Of Intervention Site Name GPS Co-ordinates Amount Sanctioned Work Status
Protection wall Dompamthat 25.268645 91.340535 Rs. 4,00,000 Completed

C:\Users\w10\Desktop\CLLMP\nongktieh image\20220528_081937.jpg

Fig: Protection wall at Dompamthat.


8. Type Of Intervention Site Name GPS Co-ordinates Amount Sanctioned Work Status
Protection Wall Nongktieh 25.267758 91.340375 Rs. 3,71,600 Completed

Fig: Protection wall at Nongktieh.

9. Type Of Intervention Site Name GPS Co-ordinates Amount Sanctioned Work Status
Natural footpath Nongktieh 25.268282 91.340345 Rs. 78,500 Completed

Fig: Natural Footpath at Nongktieh.


10. Type Of Intervention Site Name GPS Co-ordinates Amount Sanctioned Work Status
Plantation Work Dewbyrtha 25.270523 91.338463 Rs. 95,070 Completed

Fig: Plantation works at Photdewbyrtha.


11. Type Of Intervention Site Name GPS Co-ordinates Amount Sanctioned Work Status
Afforestation Development work Photdewbyrtha, Ipliang, Phlang 25.268718 91.338382 Rs.1,50,000 Completed

Fig: Afforestation Development work at Photdewbyrtha, Ipliang, Phlang.

Figure: Afforestation at Photdewbyrtha.

Figure: Afforestation

at

Photphlang.


10. FUND STATUS:

Fund Released to VNRMC (Project Implementation) Total No. of Work Order Issued Total amount Issued under CLLMP (Per Activity) Amount Spent

Work

Order

Issued Date

Start Date End Date

Rs. 21,55,000

Rs. 5,00,000

11

Soak Pit, drain and platform at Photdewbyrtha

Rs.29,160

Rs.29,160 25th Jul 2019 1st Oct 2019 18th Oct 2019

Drip Irrigation Works: CC Dam at Nongktieh Umsaw

Rs.3,00,000

Rs. 3,00,000 14th Dec 2021 1st Jan 2022 22nd Feb 2022
Drip Irrigation Works: Ground Water Tank at Nongktieh Rs.3,00,000 Rs. 3,00,000 14th Dec 2021 1st Mar 2022 21st Apr 2022
Drip Irrigation Works: Distribution Tank at Nongktieh Rs.4,80,000 Rs. 4,80,000 14th Dec 2021 2nd Feb 2022 25th Apr 2022

Water Harvesting Structure at Nongktieh

Rs.2,50,000

Rs.

2,50,000

31st Mar 2022 4th Apr 2022 9th May 2022
Afforestation work Development Rs.1,50,000 Rs. 1,50,000 31st Mar 2022 1st Jun 2022 29th Jun 2022

Plantation Work

Rs.95,070

Rs.95,070 31st Mar 2022 2nd May 2022 20th May 2022

Protection Wall at Dombyrthad

Rs.4,00,000

Rs. 4,00,000 31st Mar 2022 4th Apr 2022 13th May 2022

Roadside Tree Plantation at Nongktieh

Rs.49,900

Rs.49,900 6th May 2022 6th Jun 2022 14th Jun 2022

Protection Wall at Nongktieh

Rs.3,71,600

Rs.

3,71,600

31st Mar 2022 1st Aug 2022 1st Sep 2022

Natural Foot Path at Nongktieh

Rs.78,500

Rs.78,500 31st May 2022 1st Jul 2022 13th Jul 2022
Total Rs.


11. GROUND TESTIMONIALS:

Shemborlang Rngaid

President Nongktieh VNRMC

I have been a President of Nongktieh VNRMC for the past 3 years and I am grateful since the coming of the project within our village as with it comes much development that aims at conservation of our surroundings. According to me the Drip irrigation works is one of the best interventions that had been implemented by the Project in our village as it has provided water supply to our fields especially during the lean season. We as a community we will strive our best to protect and conserve our land, water and forest for years to come as we have been taught.

Mr.Nimrose Riamsiej

VCF M&E

I was appointed as a VCF of M&E Nongktieh VNRMC since the onset of Project in our village on the 2019 during a village durbar meeting. Through the CLLMP, I had undergone different trainings which have benefitted me in improving maintaining the different registers and also, I have been trained on filling of the MIS (Management Information System) online. This Project have also given me an opportunity to improve and conduct public village meetings. I would also like to express my gratitude towards the Project as it had brought with it an overall development in our community.

Mrs. Totally Langte

Secretary Nongktieh VNRMC

Being the Secretary of the VNRMC, I have indeed been in the front and centre in the implementation of the Project in our village. I have had much experience in maintaining the books of records such as the minute books and the many different registers that needs to be updated monthly and I have been benefitted by it all because CLLMP had given me this opportunity. I am responsible in bringing to the table the agendas needed for discussion and this have given me the courage to speak in a public platform.


Miss. Joyfully Syiemlieh

VCF Social

With the coming of the CLLMP in our village, it has extended the help in conservation of our natural resources and much has been done with the different interventions that this office has carried out with the understanding with the VNRMC members. As a Social VCF I have had many opportunities to attend many trainings that have been conducted by this office which have improved my confidence in conducting myself in a public meeting. This is one of the projects that provides employment and wages equally to men and women, and also the knowledge I have gathered over the years will help me to take up responsibility in conserving the environment.

_____________________******************______________________